皇冠体育app

Skip to main content
Low carbon technologies

Research and statistics

Skip to results
286 results that are All research and statistics, sorted by Updated (newest)
  • A report carried out by Hayes McKenzie for the Department of Energy and Climate Change to investigate the way in which noise impacts for wind鈥�

  • Optimization of CO2 Storage In CO2 Enhanced Oil Recovery Projects; this report was undertaken by Advanced Resources International (ARI).

  • Legal review of the risks for government of holding a competition to find a tidal power operator

  • Assessment by Imperial College of the validity of 鈥楢pproximate minimum land footprint for some types of CO2 capture plant鈥� provided as a guide鈥�

  • Severn Embryonic Technology Scheme - Final Report and Development Route Map (Rolls Royce)

  • Severn Tidal Power - sea theme paper: Freshwater environment and associated interfacess. Prepared by Parsons Brinckerhoff Ltd. Full version 鈥�

  • 皇冠体育app Renewables Obligation Order 2009 introduced changes that require the Secretary of State to announce the level of the Obligation six months鈥�

  • Findings from the investigation into the potential for tidal power energy projects on the Severn estuary.

  • A report that considers how unconventional gas resources might affect gas markets in the future.

  • A survey of the supply chain to identify possible constraints that could affect the Severn tidal power project.

  • DECC commissioned P枚yry Energy Consulting to examine the security of the UK鈥檚 gas supply between 2010 and 2025, and advise as to whether government鈥�

  • DECC commissioned P枚yry to undertake a detailed qualitative and quantitative analysis of the key risk factors affecting the security of gas 鈥�

  • P枚yry Energy Consulting - using as an associate the global LNG expert, Andy Flower - has been commissioned to examine the key factors affecting鈥�

  • Assessing the environmental effects of a tidal power project in the Severn estuary.

  • Toolkit for compensating for impact on habitats of an eventual tidal power scheme on the Severn estuary

  • Appraisal of options for new site designations under Article 6 of the Habitats Directive

  • How the extent of the impact of a development can be calculated using compensation ratios.

  • Details of impacts resulting from changes in the environment associated with the shortlisted tidal power schemes.

  • Estimating the economic value of the ecosystem changes due to the Severn estuary tidal power scheme

  • A strategic level review of the issues surrounding potential habitat creation mitigation/compensation measures for SPA waterbirds affected by tidal power development on the Severn Estuary.