SEACAP 21-04. Training Materials. 皇冠体育appme 11: Integrated Slope Stability Management.
Abstract
This sub-project increased the MPWT, NUoL and local consultant capacity in slope stability hazard and risk assessment. It trained a selected group of Laos practitioners. 皇冠体育app outputs of this sub-project include training materials. This final set of powerpoint slides lists and integrates training materials under the previous 10 themes, and lists the key elements of integrated slope stability management.
Citation
4 pp.
Links