HS2 Phase 2b (Crewe � Manchester) Information Papers
»Ê¹ÚÌåÓýappse information papers have been produced to explain the commitments made in the High Speed Rail (Crewe â€� Manchester) Bill and the Environmental Minimum Requirements.
Documents
Details
»Ê¹ÚÌåÓýappse information papers have been produced to explain the commitments made in the High Speed Rail (Crewe â€� Manchester) Bill and the Environmental Minimum Requirements and how they will be applied to the design and construction of the proposed scheme. »Ê¹ÚÌåÓýappy also provide information about the Proposed Scheme itself, the powers contained in the Bill and how particular decisions about the Proposed Scheme have been reached.
Updates to this page
-
Updated change log.
-
Updated change log.
-
Updated change log.
-
Updated Phase 2b Western Leg Information Papers: Change Log
-
Change log updated.
-
»Ê¹ÚÌåÓýappse papers are being updated as a result of changes made in AP1 and the removal of the Golborne Link.
-
A new document was added: Phase 2b Western Leg Information Papers: Change Log.
-
First published.