Consultation outcome

Energy Company Obligation (ECO): Help to Heat

This was published under the 2015 to 2016 Cameron Conservative government
This consultation has concluded

Read the full outcome

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Detail of outcome

皇冠体育app ECO: Help to Heat consultation ran from 29th June 2016 to 17th August 2016. 皇冠体育app consultation received 236 formal responses. All comments have been given full consideration in the development of this Government response as well as for the purpose of further developing proposals for the longer term scheme. 皇冠体育app Department is grateful to everyone who took the time to respond to the consultation.

皇冠体育app majority of responses were supportive of most of the proposals.

Stakeholders generally agreed with focusing the scheme more on installations which made the most impact on reducing fuel poverty (more insulation, fewer replacement gas boilers), although views were split on the level of replacement boilers and solid wall insulation.

皇冠体育appre were concerns about the scale of change for a one-year scheme, with suggestions on how to mitigate this. 皇冠体育appre was broad support for the overarching simplification of delivery and administration of the scheme.

Key policy decisions made include:

  • An 18 month extension to the ECO scheme (April 2017 鈥� September 2018).
  • Introduction of a more simplified and targeted scheme. 皇冠体育app Affordable Warmth Group will be increased to around 4.7m rather than 4m (in consultation) households. This will include more households who are in fuel poverty, and those on lower incomes, who may be struggling to meet heating and other bills;
  • eligibility for certain measures under Affordable Warmth will be extended to social housing in EPC bands E, F or G;
  • Local authorities will have a role in determining eligible homes, following the introduction of the 鈥榝lexible eligibility鈥� mechanism, which suppliers can use for up to 10% of their Affordable Warmth obligation;
  • the requirement to deliver a minimum level of solid wall insulation will be increased from the proposed equivalent (in consultation) of 17,000 measures per year to 21,000 per year;
  • rural delivery will be protected as 15% of Carbon Emission Reduction Obligation will be delivered in rural areas.
  • administration will be simplified. 鈥楧eemed scores鈥� will be introduced in place of the current Standard Assessment Procedure (SAP) methodology.

Original consultation

Summary

This consultation seeks views on proposed changes to ECO for 2017-18 and aspects of the high level design for a longer term supplier obligation (2018-22).

This consultation ran from
to

Consultation description

皇冠体育app Energy Company Obligation (ECO) is a programme to deliver energy efficiency measures in homes across Great Britain in order to reduce carbon emissions and improve the ability of low income and vulnerable consumers to heat their homes to comfortable levels. ECO was launched in January 2013 and is currently in its second obligation period, which is due to end on 31 March 2017. 皇冠体育app Government鈥檚 Spending Review 2015 announced plans for a supplier obligation to run for 5 years from April 2017 at an estimated level of 拢640 million per year.

Alongside our ECO consultation document we have published an illustrative draft of the regulations to enable stakeholders to understand how the proposals in the document could be implemented. This is provided for information only.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Updates to this page

Published 29 June 2016
Last updated 30 January 2017 show all updates
  1. Consultation response and IA.

  2. First published.

Sign up for emails or print this page